naavra

Naavra Repairs & Dry-dock

Keep the docking bill close to the plan

A docking can cost around USD 1 million. If an older ship's docking runs 15 to 30% over, that is USD 150,000 to 300,000 more. Repairs & Dry-dock plans every docking, builds the specification from the ship's own record, has yards price it on a link and shows the cost forecast every day, so extras are approved before they are spent.

Docking spend

What the price is set against

USD 1 million

Roughly what a docking can cost, yard bill and owner supply together, before the days off hire.

15 to 30% over

What an overrun of that size on an older ship adds: USD 150,000 to 300,000 on a USD 1 million docking.

1% is USD 10,000

Avoiding 1% of a USD 1 million docking pays for many years of Repairs & Dry-dock on that vessel, at the price shown for your region.

An illustration, not a statistic: dockings vary widely by ship, yard and scope, and there is no reliable public figure for how often they overrun. The 15 to 30% range is a working assumption for older ships, not a published figure.

What you get

  • Fleet dry-dock planner: docking windows against class and statutory deadlines and charter commitments
  • Standard job library by vessel class, and a specification built from it, issued as PDF and spreadsheet
  • The specification drafts itself from maintenance falling due, survey items, open defects and the last docking report
  • Defects from the crew, each showing whether it made the specification and what was decided
  • Next-docking, wet-dock and stand-down lists side by side, with a holding area for defects still to inspect
  • Yards price the specification on a link; bids compared job by job in mixed currencies, gaps flagged
  • Job prices compared with what you have paid before, by yard and region
  • Cost forecast every day: actual when done, bid while in progress, estimate for extras, against budget
  • Extras and variations with cost, photos and your approval; overrun warning before it happens
  • Daily docking report drafted from the superintendent's voice and photos, confirmed by the superintendent
  • Yard invoice reconciled job by job against the bid; disputed lines listed
  • Yard rating after every docking; 12-month warranty items tracked and claimed before expiry
  • Import of old specifications, job libraries and docking history from spreadsheets and desktop docking files
  • Yards and contractors work on their own link page, free

Price

Prices shown for your region. Your region is confirmed at checkout by your billing address and tax registration. Shown in USD. Prices exclude applicable taxes (GST/VAT/sales tax), which are calculated at checkout by your location.

  • Per vessel

    Every docking and every repair list for the vessel, the fleet planner, unlimited users

    $49 a vessel a month
  • One docking

    One docking project from specification to warranty close, open for 18 months, unlimited users

    $1,900 a docking

What it stands on

The core is included, and so is room to grow

The core every product stands on

  • Sign-in with a passkey or your single sign-on
  • Your fleet register: each vessel's name, IMO number, flag and class
  • Documents: one place for every file the product uses, with versions

Included with every product and bundle at no charge. It is the same core the full platform uses, so nothing is migrated when you add more.

With the full platform, you also get

  • Posting docking costs to your ledger with the capital and operating split
  • Owner-supplied spares ordered through purchasing (or add Procurement)
  • Paying the yard: a payment is always released by two people in the platform's money area

Grow from here

Add Maintenance, Stores and Safety & Forms and the Technical bundle price applies. On the full platform the docking posts to your ledger, owner supply runs through purchasing and the specification reads the maintenance plan directly.

How we compare

Compared with desktop dry-docking software

REFMAN is a mature, well-regarded desktop product with a large job library behind it, and a docking superintendent who knows it is productive in it. Naavra Repairs & Dry-dock does the same job in the browser and on the phone, with yards working on a link and the specification drafted from the ship's own record. For one ship, the first year costs USD 490 billed annually (USD 588 monthly) against GBP 4,900 plus 17.5% support. For a large fleet over five years the totals come close to each other, and the difference is in the work: nothing to install, yards on a link, and every job linked to the defect and the survey item behind it.

  • REFMAN (Minitech Systems, UK). Desktop licence. Specification generator and cost control from GBP 4,900 for one ship to GBP 19,300 for 26 ships or more; with the shipboard module, networked, GBP 7,650 to GBP 32,050. Time planning, yard evaluation, contractor comparison and defect status are extra modules. Support and updates 17.5% of the software cost a year. Source, checked 25 Sep 2026

Public list prices as published, on the date shown. Products differ in scope.

Questions

About Repairs & Dry-dock

What does Repairs & Dry-dock cost?

The price for your region is shown on this page: per vessel a month, with two months free when billed annually, or one docking project on its own, open for 18 months. Prices shown for your region. Your region is confirmed at checkout by your billing address and tax registration. Taxes are added at checkout.

Can we bring our specifications and job library from desktop docking software?

Yes. Old specifications, job libraries and docking history import from spreadsheets and desktop docking files. Your yards then price the specification on a link, free, and your superintendent works in the browser and on the phone, with nothing to install.

Start

Start Repairs & Dry-dock on your own ships

Start it for one ship or one desk at its public price: what it stands on and what it costs for your region is shown on this page.